{"id":2471,"date":"2026-08-14T05:00:34","date_gmt":"2026-08-14T09:00:34","guid":{"rendered":"https:\/\/www.arubaports.com\/main\/?p=2471"},"modified":"2026-08-13T15:56:12","modified_gmt":"2026-08-13T19:56:12","slug":"construction-of-isps-complaint-masonry-security-fence","status":"publish","type":"post","link":"https:\/\/www.arubaports.com\/main\/construction-of-isps-complaint-masonry-security-fence\/","title":{"rendered":"Construction of ISPS-Compliant Masonry Security Fence"},"content":{"rendered":"<p style=\"text-align: center;\">The Aruba Ports Authority N.V. is publicly tendering:<\/p>\n<p style=\"text-align: center;\">Construction of ISPS-Compliant Masonry Security Fence<br \/>\nAccording to the tender document: CAPEX PROJECT APA-PFAU-26-01<\/p>\n<p style=\"text-align: center;\"><em><strong>ISPS-Compliant Masonry Security Fence CAPEX Project APA-PFAU-26-01<\/strong><\/em><\/p>\n<p><strong><br \/>\nShort Project description:<\/strong><\/p>\n<p>The project consists of the following activities: The project entails the phased demolition of the existing ISPS-Compliant security wire fence and the construction of a new reinforced masonry ISPS-Compliant security perimeter wall. The new wall will be located along the north side of the Customs Investigation Office, extending from the existing fence corner to the existing masonry security wall adjacent to the Terminal 1 Generator Area.<\/p>\n<p>Please download the PDF document for more details and instructions.<\/p>\n<hr \/>\n<p><a href=\"https:\/\/www.arubaports.com\/main\/wp-content\/uploads\/2026\/08\/Lver-Anouncement-ISPS-Complaint-Security-Fence-2026-2.pdf\" target=\"_blank\" rel=\"noopener\">Download in PDF format<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Aruba Ports Authority N.V. is publicly tendering: Construction of ISPS-Compliant Masonry Security Fence According to the tender document: CAPEX PROJECT APA-PFAU-26-01 ISPS-Compliant Masonry Security Fence CAPEX Project APA-PFAU-26-01 Short Project description: The project consists of the following activities: The project entails the phased demolition of the existing ISPS-Compliant security wire fence and the construction [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[4],"tags":[],"_links":{"self":[{"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/posts\/2471"}],"collection":[{"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/comments?post=2471"}],"version-history":[{"count":2,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/posts\/2471\/revisions"}],"predecessor-version":[{"id":2494,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/posts\/2471\/revisions\/2494"}],"wp:attachment":[{"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/media?parent=2471"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/categories?post=2471"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/tags?post=2471"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}