{"id":2451,"date":"2026-07-02T05:00:29","date_gmt":"2026-07-02T09:00:29","guid":{"rendered":"https:\/\/www.arubaports.com\/main\/rehabilitation-and-structural-repair-of-the-%e2%80%b3vis%e2%80%b3-pier-port-of-barcadera-opex-project-apa-pfau-13b-25-2-copy\/"},"modified":"2026-06-23T11:10:06","modified_gmt":"2026-06-23T15:10:06","slug":"rehabilitation-and-structural-repair-of-the-albert-pier-port-of-oranjestad","status":"publish","type":"post","link":"https:\/\/www.arubaports.com\/main\/rehabilitation-and-structural-repair-of-the-albert-pier-port-of-oranjestad\/","title":{"rendered":"Rehabilitation and Structural Repair of the \u2033Albert Pier\u2033 &#8211; Port of Oranjestad"},"content":{"rendered":"<p style=\"text-align: center;\">The Aruba Ports Authority N.V. is publicly tendering:<\/p>\n<p style=\"text-align: center;\">Rehabilitation and Structural Repair of the \u2033Albert Pier\u2033 &#8211; Port of Oranjestad<br \/>\nAccording to the tender document: CAPEX PROJECT APA-PFAU-3-25<\/p>\n<p style=\"text-align: center;\">Rehabilitation and Structural Repair of the \u2033Albert Pier\u2033 &#8211; Port of Oranjestad<br \/>\nCAPEX Project APA-PFAU-3-25<\/p>\n<p><strong>Short Project description:<\/strong><br \/>\nThe project involves the rehabilitation and structural repair of the Albert Pier at the Port of Oranjestad. Its principal objective is to restore the pier\u2019s structural integrity and operational capability, with a specific focus on enabling and supporting catamaran operations through the provision of a safe, reliable, and functional marine facility.<\/p>\n<p>The project shall include, but is not limited to, the following main activities:<\/p>\n<ul>\n<li>Demolition of the existing deteriorated coping of the quay wall structure.<\/li>\n<li>Removal and replacement of reinforcing steel.<\/li>\n<li>Casting of new concrete coping.<\/li>\n<li>Removal of the existing asphalt top layer on the quay platform.<\/li>\n<li>Installation of a new asphalt top layer.<\/li>\n<li>Supply and Installation of new galvanized cleats.<\/li>\n<li>Installation of protective vehicle barriers (&#8220;Arubaantjes&#8221;).<\/li>\n<\/ul>\n<p>Please download the PDF document for more details and instructions.<\/p>\n<hr \/>\n<p><a href=\"https:\/\/www.arubaports.com\/main\/wp-content\/uploads\/2026\/06\/Lver-Anouncement-Albert-Pier-2026.pdf\" target=\"_blank\" rel=\"noopener\">Download in PDF format<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Aruba Ports Authority N.V. is publicly tendering: Rehabilitation and Structural Repair of the \u2033Albert Pier\u2033 &#8211; Port of Oranjestad According to the tender document: CAPEX PROJECT APA-PFAU-3-25 Rehabilitation and Structural Repair of the \u2033Albert Pier\u2033 &#8211; Port of Oranjestad CAPEX Project APA-PFAU-3-25 Short Project description: The project involves the rehabilitation and structural repair of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[4],"tags":[],"_links":{"self":[{"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/posts\/2451"}],"collection":[{"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/comments?post=2451"}],"version-history":[{"count":2,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/posts\/2451\/revisions"}],"predecessor-version":[{"id":2454,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/posts\/2451\/revisions\/2454"}],"wp:attachment":[{"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/media?parent=2451"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/categories?post=2451"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/tags?post=2451"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}