{"id":2405,"date":"2026-03-26T05:00:43","date_gmt":"2026-03-26T09:00:43","guid":{"rendered":"https:\/\/www.arubaports.com\/main\/?p=2405"},"modified":"2026-03-20T16:12:49","modified_gmt":"2026-03-20T20:12:49","slug":"reconstruction-fruit-pier-at-port-of-barcadera","status":"publish","type":"post","link":"https:\/\/www.arubaports.com\/main\/reconstruction-fruit-pier-at-port-of-barcadera\/","title":{"rendered":"Reconstruction &#8216;Fruit&#8217; Pier at Port of Barcadera"},"content":{"rendered":"<p style=\"text-align: center;\">The Aruba Ports Authority N.V. is publicly tendering:<\/p>\n<p style=\"text-align: center;\">Reconstruction \u2033Fruit\u2033 Pier at Port of Barcadera<br \/>\nAccording to the tender document: OPEX PROJECT APA-PFAU-13A-25<\/p>\n<p style=\"text-align: center;\">Reconstruction \u2033Fruit\u2033 Pier at Port of Barcadera OPEX Project APA-PFAU-13A-25<\/p>\n<p><strong>Short Project Description<\/strong><br \/>\n<strong>The project consists of the following activities:<\/strong><br \/>\nThe primary objective of this project is to rehabilitate the Fruit Pier by reconstructing the existing deck structure. The project aims to restore the structural performance and operational functionality of the pier while ensuring that the facility meets current safety and operational standards.<br \/>\nThrough the implementation of the proposed works, the project seeks to:<\/p>\n<ul>\n<li>Extend the service life of the pier infrastructure.<\/li>\n<li>Improve the structural reliability and safety of the facility.<\/li>\n<li>Ensure the continued efficient operation of small-vessel activities within the harbor.<\/li>\n<li>Reduce the risk of operational disruptions caused by infrastructure deterioration.<\/li>\n<\/ul>\n<p><strong>Execution period:<\/strong> 30 workable days.<br \/>\n<strong>Tentative project time frame:<\/strong> June 24 up to Augustus 07, 2026.<br \/>\n<strong>Working hours:<\/strong> Monday through Friday from 07:00 to 07:00 hrs.<br \/>\n<strong>Project management:<\/strong> Aruba Ports Authority N.V.<br \/>\nThe validity proposal period is 60 days.<\/p>\n<p>The tender documents will be available from <strong>March 30, 2026, up to April 02, 2026<\/strong>, at the main office of the Aruba Ports Authority N.V. or via E-mail against a payment of AWG. 250,00<br \/>\nOffice hours are from Monday to Friday, from 8 am to 12 pm and 1 pm to 4.30 pm.<br \/>\nThe tender documents can also be requested digitally via email <a href=\"mailto:tender@arubaports.com\">tender@arubaports.com<\/a> by sending a proof transfer with your email request between March 30, 2026, up to April 02, 2026. Cut-off time will be 4.30pm.<\/p>\n<p>Bank information: <strong>CMB<\/strong> acc. Nr. 152 67 105; <strong>AB<\/strong> acc nr.12 87 10; <strong>RBC<\/strong> acc nr.305 49 42 with the description: TOR project nr. APA &#8211; PFAU-1-2025.<br \/>\nRegarding this project, and information meeting will be held on <strong>April 08, 2026<\/strong>, at <strong>10:30 hrs. local time<\/strong> at the main office of Aruba Ports Authority N.V. (APA)<\/p>\n<p>The memorandum of the information meeting will be available on April 22, 2026, to all who have purchased the tender documents.<\/p>\n<p>Your proposal should be submitted in a sealed envelope on <strong>April 29, 2026<\/strong>, between <strong>8:00 am \u2013 11:45 am and 1:00 pm \u2013 2:00 pm. local time<\/strong> in the box located at APA\u2019s head office building located at L.G. Smith Boulevard 23.<\/p>\n<p>The tenderer must submit the following requirements with his tender:<\/p>\n<ul>\n<li>The proposal (a filled registration\/ specification of tender sum annexed to the tender document)<\/li>\n<li>A valid copy of the company\u2019s Chamber of Commerce registration.<\/li>\n<li>Copy of ID of Managing director of the company.<\/li>\n<li>A list of subcontractors to be engaged. If none, it should be stated in a letter.<\/li>\n<li>Letter of good fiscal conduct issued by the \u201cDepartamento di Impuesto (DIMP)\u201d<\/li>\n<li>Letter of good conduct of the managing director from the public prosecutor\u2019s office. (Openbaar Ministerie)<\/li>\n<li>Statement of the Court of first instance of Aruba (Gerecht in eerste aanleg van Aruba) that the tenderer is not in bankruptcy (faillisement) or in suspension of payments (Surseance van betaling)<\/li>\n<li>All documents required in the Terms of reference tender conditions mentioned in <strong>EXHIBIT A on pages 38, 39 and 40.<\/strong><\/li>\n<\/ul>\n<hr \/>\n<p><a href=\"https:\/\/www.arubaports.com\/main\/wp-content\/uploads\/2026\/03\/Lver-Anouncement-Fruit-Pier-2026.pdf\" target=\"_blank\" rel=\"noopener\">Download in PDF format<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Aruba Ports Authority N.V. is publicly tendering: Reconstruction \u2033Fruit\u2033 Pier at Port of Barcadera According to the tender document: OPEX PROJECT APA-PFAU-13A-25 Reconstruction \u2033Fruit\u2033 Pier at Port of Barcadera OPEX Project APA-PFAU-13A-25 Short Project Description The project consists of the following activities: The primary objective of this project is to rehabilitate the Fruit Pier [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[4],"tags":[],"_links":{"self":[{"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/posts\/2405"}],"collection":[{"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/comments?post=2405"}],"version-history":[{"count":2,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/posts\/2405\/revisions"}],"predecessor-version":[{"id":2410,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/posts\/2405\/revisions\/2410"}],"wp:attachment":[{"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/media?parent=2405"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/categories?post=2405"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/tags?post=2405"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}