{"id":2242,"date":"2025-03-07T06:00:22","date_gmt":"2025-03-07T10:00:22","guid":{"rendered":"https:\/\/www.arubaports.com\/main\/?p=2242"},"modified":"2025-03-06T18:28:52","modified_gmt":"2025-03-06T22:28:52","slug":"publicly-tendering-installation-of-fenders-at-the-port-of-oranjestad","status":"publish","type":"post","link":"https:\/\/www.arubaports.com\/main\/publicly-tendering-installation-of-fenders-at-the-port-of-oranjestad\/","title":{"rendered":"Publicly tendering: Installation of fenders at the Port of Oranjestad."},"content":{"rendered":"<h3>The Aruba Ports Authority N.V. is publicly tendering:<\/h3>\n<p>Installation of fenders at the port of Oranjestad.<br \/>\nAccording to the tender document for Capex Project APA-PFAU-1-25<\/p>\n<h4>\u201cInstallation of fenders at the Port of Oranjestad.\u201d<\/h4>\n<p>Short Project description:<br \/>\nThe project consists of the following activities<br \/>\nRemoving old brackets from existing fenders and\/or car tires.<\/p>\n<ul>\n<li>repairing the coping edge at each fender location.<\/li>\n<li>Installation of protective plates (UHMW-PE) against the quay wall for each fender.<\/li>\n<li>Installation of 4 pieces of &#8220;brackets or U-Anchor&#8221; for each fender.<\/li>\n<li>Note: the fenders are not installed.<\/li>\n<\/ul>\n<p><strong>Execution period:<\/strong> 80 days.<br \/>\n<strong>Commencement date:<\/strong> May 6, 2025<br \/>\n<strong>Completion date:<\/strong> no later than September 30, 2025<br \/>\n<strong>Working hours:<\/strong> 24\/7 possible in coordination with APA.<br \/>\n<strong>Project management<\/strong>: Aruba Ports Authority N.V.<br \/>\nThe validity proposal period is 60 days.<\/p>\n<p>The tender documents will be available for purchase from <strong>March 10, 2025, up to March 14, 2025 until 4:30 pm local time<\/strong>, via e-mail <a href=\"mailto:tender@arubaports.com\">tender@arubaports.com<\/a> against a payment of A]l. 500.00. The request for the tender documents must include proof of transfer in the requesting e-mail. Note that the cut-off time for receipt of request and proof of transfer is March 14, 2025, at 4:30 pm local time.<\/p>\n<p><strong>Bank Account Information:<\/strong><br \/>\n<strong>BeneFiciary:<\/strong> Aruba Ports Authority N.V.<br \/>\n<strong>CMB:<\/strong> 15267105<br \/>\n<strong>Aruba Bank:<\/strong> 128710<br \/>\n<strong>RBC:<\/strong> 7700000030549428<br \/>\n<strong>Description\/Reference:<\/strong> TOR project nr. APA \u2013 PFAU \u2013 1 \u2013 25<\/p>\n<p>Regarding this project and information meeting will be held on <strong>March 21, 2025<\/strong>, at <strong>10:30 am local time<\/strong> at the main of]ice of Aruba Ports Authority N.V. (APA).<\/p>\n<p>The proposal should be submitted in a sealed envelope on<strong> April 11, 2025<\/strong>, between <strong>8:00 am &#8211; 11:45 am and 1:00 \u2013 2:00 pm local time<\/strong> in the box located at APA\u2019s Port Administration Building, L.G. Smith Boulevard 23, Oranjestad, Aruba.<\/p>\n<p>The tenderer must submit the following requirements with his tender:<\/p>\n<ul>\n<li>The proposal (a filled registration\/ specification of tender sum annexed to the tender document)<\/li>\n<li>A valid copy of the company\u2019s Chamber of Commerce registration.<\/li>\n<li>Copy of ID of Managing director of the company.<\/li>\n<li>A list of subcontractors to be engaged. If none, it should be stated in a letter.<\/li>\n<li>Letter of good fiscal conduct issued by the \u201cDepartamento di Impuesto (DIMP)\u201d<\/li>\n<li>Letter of good conduct of the managing director from the public prosecutor\u2019s office. (Openbaar Ministerie)<\/li>\n<li>Statement of the Court of first instance of Aruba (Gerecht in eerste aanleg van Aruba) that the tenderer is not in bankruptcy (faillisement) or in suspension of payments (Surseance van betaling)<\/li>\n<li>All documents required in the Terms of reference tender conditions at paragraph102.<\/li>\n<\/ul>\n<p>Disclaimer: In the event of any discrepancy between this publication and the TOR, the TOR shall prevail.<\/p>\n<hr>\n<p><a target=\"_blank\" href=\"https:\/\/www.arubaports.com\/main\/wp-content\/uploads\/2025\/03\/Tender-Installation-of-Fenders-Website-FINAL-VERSION.pdf\" rel=\"noopener\">Download in PDF Format<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Aruba Ports Authority N.V. is publicly tendering: Installation of fenders at the port of Oranjestad. According to the tender document for Capex Project APA-PFAU-1-25 \u201cInstallation of fenders at the Port of Oranjestad.\u201d Short Project description: The project consists of the following activities Removing old brackets from existing fenders and\/or car tires. repairing the coping [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[4],"tags":[],"_links":{"self":[{"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/posts\/2242"}],"collection":[{"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/comments?post=2242"}],"version-history":[{"count":3,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/posts\/2242\/revisions"}],"predecessor-version":[{"id":2247,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/posts\/2242\/revisions\/2247"}],"wp:attachment":[{"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/media?parent=2242"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/categories?post=2242"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/tags?post=2242"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}