{"id":1081,"date":"2017-07-10T17:50:32","date_gmt":"2017-07-10T21:50:32","guid":{"rendered":"http:\/\/www.arubaports.com\/main\/?p=1081"},"modified":"2017-07-10T17:50:32","modified_gmt":"2017-07-10T21:50:32","slug":"public-procurement-dredging-channel-port-of-oranjestad","status":"publish","type":"post","link":"https:\/\/www.arubaports.com\/main\/public-procurement-dredging-channel-port-of-oranjestad\/","title":{"rendered":"Public procurement: Dredging channel port of Oranjestad"},"content":{"rendered":"<p>According to specifications: KD No. 1-2017.<\/p>\n<p><strong>Short description of the work<\/strong><br \/>\n&#8220;Dredging of loose material&#8221; maintenance dredging &#8220;from the channel port of Oranjestad Building a quay wall at Barcadera. The dredging and deposit of dredged material for the land reclamation at Barcadera. &#8221;<\/p>\n<p><strong>Duration of execution:<\/strong> 60 working days.<\/p>\n<p>The specification is available at Aruba Ports Authority N.V. from July 10, 2017, against payment of Afl. 1500, =.<br \/>\nThe payment must be met by the cashier of the Aruba Ports Authority.<br \/>\nThe public documents are available for inspection from July 10, 2017 at the Aruba Ports Authority N.V.<\/p>\n<p>Information will be provided on August 2, 2017 at 10.00 am. at the Aruba Ports Authority N.V.<br \/>\nThe information note is ready on August 4, 2017 and is from that day available from the Aruba Ports Authority N.V.<br \/>\nThe public tender will take place on August 25, 2017 at 11.00 am. at the office of the Director of the Aruba Ports Authority N.V.<br \/>\nThe L.O.A. L.B. 1996 No. 58 is applicable to this tendering.<br \/>\nThe supervision will be conducted by the Aruba Ports Authority N.V.\/KD Consult<br \/>\nThe tender price will be maintainance for a period is 60 days.<\/p>\n<p>The tenderer must submit the following requirements upon registration:<br \/>\n1. Proof of registration in the register of the Chamber of Commerce;<br \/>\n2. A list of subcontractors to be used;<br \/>\n3. Specification of tender price;<br \/>\n4. The other documents mentioned in the specifications<\/p>\n","protected":false},"excerpt":{"rendered":"<p>According to specifications: KD No. 1-2017. Short description of the work &#8220;Dredging of loose material&#8221; maintenance dredging &#8220;from the channel port of Oranjestad Building a quay wall at Barcadera. The dredging and deposit of dredged material for the land reclamation at Barcadera. &#8221; Duration of execution: 60 working days. The specification is available at Aruba [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[4],"tags":[],"_links":{"self":[{"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/posts\/1081"}],"collection":[{"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/comments?post=1081"}],"version-history":[{"count":1,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/posts\/1081\/revisions"}],"predecessor-version":[{"id":1082,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/posts\/1081\/revisions\/1082"}],"wp:attachment":[{"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/media?parent=1081"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/categories?post=1081"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.arubaports.com\/main\/wp-json\/wp\/v2\/tags?post=1081"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}